Rule 20:44:20:07 Inspection fees for electrical installations serving field irrigation systems.
20:44:20:07. Inspection
fees for electrical installations serving field irrigation systems.
Inspection fees for electrical installations serving field irrigation systems
are as follows:
(1) The inspection fee for
an irrigation system, which includes one irrigation machine, either pipe or
pivot, which is supplied by one main or booster pump and one electrical
service, is $60 plus $2 for each motor, except for the motor driving the pivot;
(2) The inspection fee for
a pumping station is computed by §§ 20:44:20:02 and 20:44:20:02.01;
(3) The inspection fee for
a diesel-driven water pump, at which the diesel also drives an electric
generator for power and controls, is computed by § 20:44:20:10;
(4) The inspection fee for
an addition to or replacement of an electrically driven pivot on an existing
system is computed by § 20:44:20:10; and
(5) The inspection fee for
a range well will be charged as a requested inspection according to
§ 20:44:20:10 and billed for each inspection hour or fraction of an hour.
Source:
SL 1975, ch 16, § 1; 2 SDR 89, effective July 2, 1976; 7 SDR 90, effective
April 1, 1981; 12 SDR 151, 12 SDR 155, effective July 1, 1986; 20 SDR 92,
effective January 1, 1994; 20 SDR 222, effective July 6, 1994; transferred from
§ 20:44:06:07, August 12, 1994; 32 SDR 37, effective September 1, 2005; 37
SDR 236, effective June 29, 2011.
General
Authority: SDCL 36-16-12, 36-16-30.
Law
Implemented: SDCL 36-16-30.
Back to
20:44:20 |
20:44:20:07 