CHAPTER 74:55:01
UNDERGROUND INJECTION CONTROL -- CLASS III WELLS
Section
74:55:01:01 Definitions.
74:55:01:02 Class III injection wells subject to the provisions of this chapter.
74:55:01:03 Permit required for well injection -- Plans and specifications required.
74:55:01:04 Date of application for new wells.
74:55:01:05 Signatories of permit application.
74:55:01:06 Qualifications for duly authorized representative of signatory.
74:55:01:07 Certification requirements of signatory.
74:55:01:08 Duration of permits.
74:55:01:09 Permit transfer.
74:55:01:10 Issuance of area permit.
74:55:01:11 Authorizing new injection wells under area permit.
74:55:01:12 Secretary's recommendation on permit applications.
74:55:01:13 Notice of recommendation.
74:55:01:14 Recommendation becomes final if uncontested.
74:55:01:15 Contents of petition.
74:55:01:16 Intervention.
74:55:01:17 Answers to petitions.
74:55:01:18 Filing procedures.
74:55:01:19 Hearing date.
74:55:01:20 Notice of hearing.
74:55:01:21 Compliance schedule for permit conditions.
74:55:01:22 Information not considered confidential.
74:55:01:23 Criteria for underground source of drinking water.
74:55:01:24 Designation of exempted aquifers.
74:55:01:25 Information considered for permit issuance.
74:55:01:26 Information required in permit application.
74:55:01:26.01 Technical revisions to an injection permit.
74:55:01:26.02 Permit amendment required.
74:55:01:27 Well inventory information.
74:55:01:28 Determination of influence of injection on groundwater.
74:55:01:29 Well mechanical integrity test.
74:55:01:30 Acceptable methods for mechanical integrity tests -- Report to secretary.
74:55:01:31 Well construction requirements.
74:55:01:31.01 Well construction requirements -- Injection wells.
74:55:01:32 Conducting well logs.
74:55:01:33 Supervision of well construction and testing.
74:55:01:34 Determining information on water-bearing injection zone.
74:55:01:35 Establishment of baseline water quality in new mining areas.
74:55:01:36 Confinement of recovery fluid.
74:55:01:37 Repealed.
74:55:01:38 Monitor well requirements in formation not considered underground source of drinking water.
74:55:01:39 Monitoring subsidence.
74:55:01:40 Minimum requirements for monitor wells.
74:55:01:41 Production area monitor well location and spacing requirements.
74:55:01:42 Nonproduction zone monitoring.
74:55:01:43 Secretary to sample monitor wells.
74:55:01:44 Prohibitions -- Injection volumes and pressure.
74:55:01:45 Repealed.
74:55:01:45.01 Ground water restoration table.
74:55:01:46 Production area operational monitoring requirements.
74:55:01:47 Reporting requirements for injection zone.
74:55:01:48 Duration of monitoring program.
74:55:01:49 Reporting requirements.
74:55:01:50 Verifying analysis.
74:55:01:51 Excursion sampling frequency.
74:55:01:52 Reporting excursions.
74:55:01:53 Remedial action for excursion.
74:55:01:53.01 Excursions -- Controlled.
74:55:01:53.02 Excursions -- Not controlled.
74:55:01:54 Criteria for determination of adequacy of remedial action plan.
74:55:01:55 Ground water restoration requirements.
74:55:01:56 Restoration progress reports.
74:55:01:57 Restoration sampling procedure.
74:55:01:58 Final restoration -- Restoration values achieved.
74:55:01:58.01 Restoration values not achieved.
74:55:01:59 Requirements for plugging wells, drill holes, and the repair and conversion of wells.
74:55:01:59.01 Well plugging records.
74:55:01:59.02 Maintenance and retention of records.
74:55:01:59.03 Corrective actions for improperly sealed wells.
74:55:01:60 Closure of mine site following restoration.
74:55:01:60.01 Postclosure plan -- Estimated costs for postclosure care.
74:55:01:60.02 General postclosure inspection and maintenance activities.
74:55:01:60.03 Postclosure operation of monitoring systems.
74:55:01:60.04 Ground water contamination during the postclosure period.
74:55:01:60.05 End of the postclosure period.
74:55:01:60.06 Public notice for Class III wells.
74:55:01:61 Financial assurance guaranteeing the performance of corrective actions.